How to translate text using browser tools
1 January 2015 Calculation Method of the Pull-Back Force for Cable Laying of the Trenchless Completed Power Pipeline
Chuan Wu, Guojun Wen, Xiaoming Wu, Lei Han, Jie Xu, Wenqiao Wang, Hui Xie, Rui Li
Author Affiliations +
Abstract

Wu, C.; Wen, G.; Wu, X.; Han, L.; Xu, J.; Wang, W.; Xie, H., and Li, R., 2015. Calculation method of the pull-back force for cable laying of the trenchless completed power pipeline.

Typically, trenchless drilling rig is used in cable laying in power system. Then through the windlass; the cable is pulled into the pipeline. Although the size of the pull-back force is very important to calculate the pull-back force in cable laying, the existing calculation equation for pull-back force is targeted at pull-back force in pipeline laying. This article analyzes the frequently-used calculation equations and its service condition in pipeline laying. And a pull-back force test instrument in cable laying is designed, by which a large number of pull-back force of cable laying in practical engineering project is collected. Through the comparison of the measured values and calculation values by the equation for pull-back force, it is founded that the equation for pull-back force in pipeline laying is suitable for the calculation of pull-back force in cable laying in case that it multiplied by a certain coefficient.

© 2015 Coastal Education and Research Foundation
Chuan Wu, Guojun Wen, Xiaoming Wu, Lei Han, Jie Xu, Wenqiao Wang, Hui Xie, and Rui Li "Calculation Method of the Pull-Back Force for Cable Laying of the Trenchless Completed Power Pipeline," Journal of Coastal Research 73(sp1), 681-686, (1 January 2015). https://doi.org/10.2112/SI73-117.1
Received: 1 August 2014; Accepted: 1 November 2014; Published: 1 January 2015
KEYWORDS
HDD
pull-back force in cable laying
pull-back force in pipeline laying
test instrument for pull-back force.
RIGHTS & PERMISSIONS
Get copyright permission
Back to Top